Measure your wall
Calculate the total area. If you have baseboards, measure from the top of the baseboard — not the floor. Feed the numbers into the calculator below; it adds the 10% for cuts and waste for you.
How to install
Both FWW lines install without contractors. The steps below are the exact method we use in our own installations — follow them and the wall comes out right the first time.
Calculate the total area. If you have baseboards, measure from the top of the baseboard — not the floor. Feed the numbers into the calculator below; it adds the 10% for cuts and waste for you.
The wall must be clean, dry, dust-free, with no peeling paint or loose plaster. Peel & stick adhesive needs a smooth, stable surface to bond properly.
Check the wall for level and square. Decide each panel's position and the direction of the interlocking edge before removing any adhesive backing.
Use a compact circular saw or miter saw for clean, straight cuts (a jigsaw works too). Run masking tape along the cut line so the melamine face never chips.
With the backing still on, hold the panel against the wall and check alignment and edge fit. Repeat until you're confident — it's a no-risk rehearsal.
Remove the protective film from the double-sided industrial tape. The adhesive is now live — handle the panel by its edges.
Rest the panel on its edge against the previous one, check it sits flush along the full length, then lower it onto the wall. The interlocking edge locks the alignment.
Roll firmly across the entire surface. Full pressure equals full adhesion — this is what makes the bond permanent.
One LOFT box covers 2.73 m². Enter your wall as it is — we add the 10% cut & waste allowance for you.
Real wood varies — that's the point. Order the samples, hold them against your wall in daylight and at night, and choose with certainty.
Area = base × height. Subtract doors and windows and put the result into the calculator below — it adds the 10% waste allowance for you.
Unpack the planks and leave them in the room for at least 72 hours. Solid wood adjusts to your home's temperature and humidity before it goes on the wall.
On installation day, wipe the wall clean. Draw a level reference line, start from the middle of the surface and work outward like a puzzle — step back every few planks to check the overall design.
Cut planks as needed, remove the liner, place each one along your reference line and press firmly with the J-roller. Full pressure across the whole plank is what makes the bond hold.
Most TERRA boxes cover 0.93 m² — the exact figure is printed on your box. Enter your wall as it is; we add the 10% waste allowance for you.
| LOFT | TERRA | |
|---|---|---|
| Acclimation | Not required | 72 hours in the room |
| Cutting | Circular or miter saw, masking tape on the line | Cutter or saw, depending on wood hardness |
| Panel joint | Interlocking edge (lap joint) | Butt joint, plank to plank |
| Layout | Planned runs, edge to edge | From the middle out, like a puzzle |
| Rehearsal | Practice with backing on before peeling | Dry-lay a few planks to preview the blend |
Still deciding? Compare TERRA vs LOFT or order samples.
Watch it happen
A TERRA install at real speed. Switch to the TERRA tab above to follow the written steps alongside it — LOFT panels install differently.
Order samplesOrder samples of any TERRA wood — hold them on your wall, test the light, then order boxes with certainty.